25,2 МW WIND POWER PLANT IN WESTERN UKRAINE AT RTB STAGE
The area of the site is approximately 190 ha and allows to place up to 11 wind turbines. According to the results of 15-month wind measurements, the average annual wind speed at the site is 5,6 m/s. All required documents to start construction are ready: the permission for construction works was obtained, the pre-PPA was signed.
Electricity yield: 56 350 MWh/year.
GHG reduction: 45,05 tons/year.
App investment size: 33 500 000 EUR.
Revenue from electricity produced: 6 117 446 EUR/year.
NPV: 7 056 227; IRR: 13,4%.
Payback period: 5.85 years.